NGA broadband network (FTTB) Angeln Los 5
Place
Schleswig – Holstein, Germany
Time
10.2019. – 12.2020.
Implemented works: civil engineering and cable laying 170 km,
assembly of fiber optic cables,
house connections,
surface restoration (asphalt and paving works).