Broadband network construction and installation

Client The city of Pottenstein / EU project
Time Works underway as of 2018

Project goal: Construction of passive fibre broadband infrastructure across the municipal territory of the city of Pottenstein.
Provide private households with the internet speed of 100 Mbps– up to 200 Mbps for download speeds and 40 Mbps for upload speeds.

LEC contribution: Line construction, installation of optical fibre cables, home connections.

Resolved challenges or problems: Lines frequently cut through rocks.

Project value:  < EUR 10 million