NGA broadband network (FTTB) Angeln Los 5
Place
Schleswig – Holstein, Germany
Time
07.2020. – 10.2021.
Implemented works: civil engineering and cable laying 128 km,
Assembly of fiber optic cables,
House connections,
Surface restoration (asphalt and paving works).